Sectors
Locations
Project Size
Project Cost
Method of Delivery
Advantage Financial Office Renovation
Ryan Peterson and his team at Advantage Financial asked us to bring to life a beautiful design provided by Alvin Reinhard Fritz Architect Inc. The design was innovative and refined with a wonderful selection of materials, finishes and space configurations. The main level received a full renovation including new offices, breakout rooms, boardroom, and reception […]
More project detailFee Simple Law Office Renovation
Fee simple law is a local southern Albertan law practice that will be moving their Lethbridge office to a newly renovated location. 319-4 Ave South is a modest professional building located across the road from the Lethbridge courthouse. The renovation consists of new flooring and paint throughout, as well as updated washrooms and staff kitchen. […]
More project detailCoaldale Joint School Recreation Centre Project
New construction of joint Coaldale High School and Recreation Centre, with a total occupied building area of 13,442m2. Construction consists of cast-in-place piles and grade beam foundations, structural steel superstructure and mass timber features. Exterior finishes include a combination of aluminum and glass curtain walls, masonry, fibre cement panels and metal cladding. The new school […]
More project detailPrecon Precast Products Plant Renovations
This project is a renovation of the Precast Manufacturing Facility, creating more covered workable space for Precon. We extended the Pre-Engineered Building by 100’. This extension required engineered screw piles, concrete foundation walls and new steel building columns with wall and roof cladding to enclose the building. In addition, we created a small link connection […]
More project detail1st Choice Savings and Credit Union – New Taber Branch
1st Choice Savings welcomes their new 4,100 square foot branch featuring the first drive-thru ATM in the Town of Taber and an open concept design to provide an exceptional experience.
More project detailAgri-Food Hub & Trade Centre
Construction of 268,000 square foot new event centre. The new facility will double current hosting capacity and will be able to accommodate more and larger national and international events with up to 7,000 people. The new facility will include many amenities to facilitate all functions with state of the art accommodations to make spaces flexible […]
More project detailMcDonald Nissan Addition & Renovation
This is a 2-phase project. Phase 1 consists of the addition to the west side of 3 new service bays and on the east side a detailing bay with storage for tools and parts. New construction is concrete foundations, brick block and steel joist & metal decking. Phase 2 is a interior demolition and renovation […]
More project detailShooting Range Upgrades
Upgrades to 5 existing shooting ranges to add overhead baffles which will follow the ” No Blue Sky Concept”. This allows for no sky to be visible when an individual is shooting at the firing line. In addition to making the range safer, the project is aimed at ensuring the long term viability of the […]
More project detailLA CRA Office Relocation
This project, for Melcor Development, was to provide construction of a tenant fitout for the CRA offices which were being relocated to the Melcor Centre. The fitout was of the entire third floor of the office tower, 893sqm. This renovation included removing partition walls which existed, this opened up the office space to provide natural […]
More project detailPalliser School Division Education Centre Upgrade
Renovation to the Palliser School Division Education Centre including mechanical and electrical upgrades.
More project detailTilley – K-9 Replacement School
The new Tilley K-9 School has a LEEDv4 Silver design mandate. It has a Learning Commons, a Gathering Space and a Public Library. Construction also includes a new gymnasium, several classrooms, a science lab, and band room. All covering a floor space of approximately 25,000 sq.ft. Once the new school is complete and everyone gets […]
More project detailLegacy Park Pavilion & Picnic Shelter
This is a City of Lethbridge supported project and part of a phased development of the first regional park in North Lethbridge. The construction consists of two buildings and a large outdoor plaza, a 695sqm community Pavilion and a 205sqm picnic shelter. The Pavilion will act as a community space containing meeting areas, public washrooms, […]
More project detailVulcan Outdoor Pool Replacement
This renovation involved demolition of existing building hazardous material abatement (vermiculite in exterior walls, lead paint removal, roof installation removal.) Installation of footings and mechanical undergrounds, Pouring a slab, frame walls (masonry and lumber). Building will contain male and female washrooms, 2 accessible washrooms, 2 universal change rooms, lobby, life guard and admin rooms, storage, […]
More project detailHenderson Ice Rink Slab Replacement
We removed the ice arena boards and glass from the small and large rink, demo the slab, west bleachers and players, and penalty boxes. We also saw demolition of HVAC as required and lights. The large rink was extended by 2.9 metres. Design and construction of new sub-base including underslab heating loop and refrigerated concrete […]
More project detailCentre for Teaching, Learning, and Innovation
New office space and book collection/learning commons area and kitchen including architectural, mechanical, and electrical scopes of work. Demo existing ceiling and required mechanical and electrical. Renovations included new mechanical and electrical work, framing and boarding for new offices, new glazing, new millwork, and painting new and existing areas. Added to the renovation was relocating […]
More project detailUniversity of Lethbridge- Science & Academic Building- Tenant Fit Out- Carvery & Bakery Retail Food
Prime General Contractor for renovation of 750sq-ft tenant space for franchise restaurant inside the new Science & Academic Building at the university of Lethbridge. During this project we worked extensively with our Ontario based Consultants, Owner Group, and Landlord to ensure that the project was turned over in the tight timeline that was offered while […]
More project detailWest Lethbridge Operations Depot Phase 2- Design & Construction of Sand/Salt Storage Building
Construction of a 1,250 sq.m. sand & salt storage storage and mixing building located on the west side on Public Operations property. It is located just of of University Drive near Highway 3. This project was part of a phased development of an operations base in West Lethbridge. The scope of work included a design […]
More project detailChinook Arch Regional Library Services Office Renovation
Expansion and Renovation to the existing Chinook Arch Regional Library building. Project will be occupied during construction and will therefore be broken into 3 phases to complete. Project includes demo and relocation of existing offices. New boardroom and staff room/kitchen area. New cataloging area, training room, acquisition, IT, system support, and staging areas to name […]
More project detailFlexahopper Plastics Ltd. – Office Renovation
This project was a complete office renovation, starting with relocating the administration and management team to a temporary office. The existing office and shipping office mezzanine were completely removed. The office footprint was expanded, structure was provided by helical piles that were drilled into the soil. Plant operations were maintained through the construction process. Careful […]
More project detailMcKillop United Church Renovation
August 04, 2019 For the past 18 months, Ward Bros. Construction Ltd. was contracted to carry out a significant renovation of the upper and lower hall section (1954 vintage) for McKillop United Church in Lethbridge, AB. The project involved a large kitchen expansion and redesign to meet commercial-level usage, new accessible washrooms, installation of a […]
More project detailSpitz Stadium Expansion and Renovation
Spitz Stadium is the host facility of the Lethbridge Bulls of the Western Major Baseball League. Spitz Stadium was constructed in 1975 and has been the premiere facility in Lethbridge ever since. The lighted baseball stadium can accommodate over 2000 people ad is hoe to over 250 games per year with an estimated annual attendance […]
More project detailStirling School Modernization
Stirling School is a regional school providing quality learning from Early Learning to Grade 12. Additions, alterations, and modernization of the school include new clerestory that will add natural light to the gathering space and complete reconstruction of all mechanical and electrical systems. The addition of a state of the art gymnasium facility means the […]
More project detailMagrath School Modernization
The Magrath School is a 110,000 square foot facility that has been educating students from Kindergarten to Grade 12 since 1953. This is the 11th renovation in the school’s history and includes a modernization of the entire building. The school is one of the focal points in the Town of Magrath and this renovation will […]
More project detailTaber KFC New Building
Rebuilt from the ground up, the KFC in Taber is the perfect picture of what a rebuild looks like. Demolition of the old building allowed for the new construction to better utilize the lot, allowing for additional parking spaces and a more optimal position for the drive thru. The new building sports a classy, rustic […]
More project detailTaco Time Interior Renovation
A front end renovation of the restaurant. Including new countertops, tilework and stainless steel. Installing all new signage and menu boards.
More project detail